🧮 Free Permit Fee Estimator

Permit Cost Calculator

Estimate permit fees, approval timelines, and inspection counts for your home project — in seconds.

No signup required 14 project types Instant results
1–2%
Typical permit fee
$50–$5K
Average fee range
$4,700
Avg. homeowner project (JCHS)
1ZIP Code
2Project
3Budget

📍 What's your ZIP code?

We'll identify your jurisdiction and local fee structures.

🏗️ What type of project?

Select the option that best describes your project.

💰 Estimated project cost?

Include labor and materials. Round numbers are fine.

$
$1K$500K+

Calculating permit fees…

✅ Estimate Ready
Estimated Permit Fee Range
$200 – $800
2–4 wks
Approval Time
2–3
Inspections
~1.2%
Of Project Cost
⚠️ Cost of skipping the permit
Unpermitted work can cost $5,000–$25,000 in fines, forced teardowns, failed home sales, or insurance denials — far more than the permit itself.
📋 Want the exact requirements for your ZIP?
Get a personalized permit guide with local fees, required documents, and inspector contacts for your area.
✓ Check your inbox! Your personalized guide is on its way.

Average Building Permit Fees by Project Type

Permit fees vary significantly by jurisdiction and project type. Most cities charge either a flat fee (common for trade permits like electrical or plumbing) or a percentage of the project's total valuation (common for structural work). The table below shows typical national averages — use the calculator above for a personalized estimate.

Project TypeTypical Fee RangeFee MethodApproval Time
🏠 Roofing$100 – $400Flat fee1–3 weeks
❄️ HVAC$100 – $300Flat fee1–2 weeks
☀️ Solar Panels$150 – $500Flat / per kW2–5 weeks
🍳 Kitchen Remodel$150 – $1,500+0.8–1.8% of cost2–6 weeks
🚿 Bathroom Remodel$100 – $900+0.6–1.5% of cost2–4 weeks
🏗️ Room Addition$500 – $5,000+1.5–2.5% of cost6–16 weeks
🏠 ADU$500 – $4,000+1.2–2.2% of cost4–12 weeks
🪵 Deck / Patio$150 – $1,200+0.8–1.8% of cost2–6 weeks
🏡 Fence$50 – $200Flat fee1–3 weeks
⚡ Electrical$75 – $250Flat fee1–3 weeks
🔧 Plumbing$75 – $300Flat fee1–3 weeks
🪟 Window Replacement$75 – $200Flat fee1–2 weeks
🔨 Demolition$100 – $500Flat / % of cost2–5 weeks
🏛️ New Construction$500 – $8,000+1.5–2.5% of cost8–24 weeks

* Fees shown are national averages. Actual fees vary by city and county. Always verify with your local building department.

Frequently Asked Questions

How much does a building permit cost? +
Most permits cost 1–2% of the project's total value, with minimum fees of $50–$500. Flat-fee permits (electrical, plumbing, HVAC) typically run $75–$350. Major projects like new construction or room additions can cost $1,000–$8,000+ in permit fees. Use the calculator above for a project-specific estimate.
How much does a roofing permit cost? +
Roofing permits typically cost $100–$400 as a flat fee for residential reroofing. Some jurisdictions calculate it as 0.5–1% of the project cost for larger jobs. The permit usually covers 1–2 inspections: a rough inspection and a final.
How much does a solar panel permit cost? +
Solar permits typically cost $150–$500 for residential systems. Some jurisdictions charge per kilowatt of system capacity. The permitting process includes a building department review and utility interconnection approval, usually taking 2–5 weeks total with 2–3 inspections.
Do I need a permit for an ADU? +
Yes. ADUs (Accessory Dwelling Units) require permits in virtually all US jurisdictions. Fees run 1.2–2.2% of project cost with a $500 minimum. Many California cities offer ADU fast-track programs that can reduce approval to 4–6 weeks. The permit covers building, electrical, plumbing, and mechanical work.
What happens if you build without a permit? +
Building without a permit can result in fines ($500–$5,000+), required teardown of the unpermitted work, insurance claim denials, and inability to sell your home. When discovered during a home sale, unpermitted work typically costs $5,000–$50,000 to resolve or causes the deal to fall through entirely.
How long does permit approval take? +
Approval time ranges from 1 day (over-the-counter permits for simple electrical/plumbing) to 6+ months (new construction in high-demand jurisdictions). Most residential projects take 2–8 weeks. Submitting complete plans digitally and calling the permit office before submitting can shave 1–3 weeks off the timeline.
Free Resource

Get Your Free Permit Guide

Enter your ZIP and email — we'll send a personalized permit checklist for your area in seconds.

✅ Guide on its way — check your inbox!

No spam, ever. Unsubscribe any time.